in Reach
Making room for construction

A few changes have been made, moving a little soil around, in preparation for the building expansion.
Preparing the ground to move sheds to new location
Sheds that hold ministry resources are being relocated from one area of the property to another.
The gas line inside the church has been relocated.
Another check that has been completed is the review of the existing septic system.
